UTILIZING DBT’S CAPABILITIES FOR DATA VAULT AUTOMATION IMPLEMENTATION OVERVIEW Implementing a Data Vault on dbt is a clear, repeatable process, heavily automated by DataVault4dbt. 1. Initial Setup – Connect and Ingest:
4. Building the Business Vault (Optional): An optional Business Vault layer can be added for defining and materializing business rules,
Raw source data is ingested into your cloud data platform, maintaining its original state for auditability. This process involves minimal, non-destructive transformations such as data type casting, avoiding applying business logic. dbt registers and monitors this source data, ensuring subsequent transformations run only when new data is available. 2. Staging Area –
complex calculations, and performance- oriented structures. These are built as
additional dbt models on top of the Raw Vault, leveraging dbt’s version control and testing. DataVault4dbt offers templates for common constructs like Point-in-Time (PIT) and Bridge tables, ensuring derived data consistency and simplifying the development of the end-user structures. 5. Information Delivery – Data Marts and Access: Data could be delivered to users via two main approaches: the dbt Semantic Layer and Data Marts, which define exposed models (e.g., star schemas) and centralize business metrics for consistent BI tool access. Alternatively, power users like data scientists can directly query the Enterprise Data Warehouse layer, with access controlled by schema permissions. 6. Scheduling, Monitoring and Maintenance: dbt orchestrates these steps through scheduled jobs. A common pattern involves a dedicated job for parallel Raw Data Vault loading. Additional jobs for Business Vault or Mart refresh are scheduled based on freshness needs, with dbt managing execution order and inter-job dependencies for reliable pipelines. dbt monitors job execution, tracks failures, and dispatches alerts. Finally, seamless Git and CI/CD integration ensure controlled, tested updates, allowing the data platform to evolve iteratively with new requirements.
Prepare the data for the Raw Data Vault:
The staging layer prepares raw data for the Raw Data Vault. Its goal is to shape data into a consistent Data Vault-aligned format without altering its meaning or applying business logic. DataVault4dbt macros automate this, assisting with prejoining tables, calculating Load Date Timestamps, generating Record Sources, and computing hash keys for business keys and hash diffs for delta detection, ensuring consistency and performance across the vault. 3. Building the Raw Data Vault – Hubs, Links, Satellites: DataVault4dbt macros and dbt models are used to create and populate Hub, Link, and Satellite tables. Developers define parameters for each entity, and DataVault4dbt generates SQL for incremental loading, aligning with Data Vault’s insert-only design. dbt jobs are scheduled to incrementally load new records and keep the Raw Data Vault updated, resulting in a unified, historical data repository.
In summary, this implementation is iterative and model-driven. dbt serves as the orchestrator and development environment, while DataVault4dbt provides templates for rapid vault structure scaffolding. This ensures a governed, consistent approach: every new source integrates into the same framework with built-in lineage and quality checks.
ARCHITECTING THE FUTURE OF ENTERPRISE DATA
9
Powered by FlippingBook